Mammoet performed load-out of Spain’s first grid-connected floating wind turbineThe load-out of the Saitec-manufactured DemoSATH floating unit took place in the Port of Bilbao, over the course of three hours. Mammoet was contracted by Noatum Logistics, Saitec’s subcontractor, to transport and load-out the ‘floater’...Read more19-10-2022|Comment|author: Emma Dailey