The installation of the bridges and lock doors for the Sassevaart lock in Terneuzen has been completed. This was done by HEBO Maritime Services and Mammoet.Read more
The Belgian heavy-lift multi-national, Sarens, has completed the installation of a walkway bridge in the commune of Hazebrouck, in the north of France. A 650-tonne crawler crane was used to install the bridge, during a...Read more