Sleipnir installs first jacket of Hollandse Kust offshore substationOffshore windThe first jacket of TenneT’s Hollandse Kust (Zuid) offshore platform has been installed in the seabed. The heavyweight Alpha jacket of 3200 tonnes was transported and installed by Heerema’s heavy lift crane vessel Sleipnir.Read more11-09-2020|Comment|author: Adnan Bajic