Topic: Load-out

Berard wraps up a couple of oversized cargo projects

Berard wraps up a couple of oversized cargo projects

Oversized cargo transport specialist Berard completed a couple of showreel projects utilising its specialised equipment. The first job entailed loading out massive topside decks, with the second one concerning the transport of a package boiler. Read more
|Comment|author: Adnan Bajic
Mammoet lifts heavy in Vietnam

Mammoet lifts heavy in Vietnam

Mammoet has seen through a four-phase project for the Sao Vang and Dai Nguyet (SVDN) gas and condensate development in Vietnam for PTSC Mechanical & Construction Company. Mammoet’s contribution to the development project included load...Read more
|Comment|author: Adnan Bajic
Mammoet loads out 4,000 ton topside in Turkmenistan

Mammoet loads out 4,000 ton topside in Turkmenistan

Dutch heavy lifting specialist Mammoet has returned to Turkmenistan to load out the Garagol Deniz Drilling Platform A’s 4,000 ton topside. The company previously supported the engineering and construction company – ILK Insaat, with the...Read more
|Comment|author: Adnan Bajic

United Heavy Lift moves 8,000-tonne turret

OffshoreUnited Heavy Lift has safely moved an 8,000-tonne turret for Equinor’s new Johan Castberg FPSO. The turret is designed by SBM Offshore and will now be shipped from Drydocks World Dubai to Singapore where the...Read more
|Comment|author: Adnan Bajic