Heavy-lift giant Aegir installs 1,650-tonne water handling moduleHeerema Marine Contractor’s heavy-lift vessel Aegir has transported and installed a 1650-metric-tonne water handling module for client Technip FMC. The module was installed on the Woodside-operated Pluto Alpha platform.Read more24-12-2020|Comment|author: Adnan Bajic