Topic: Topsides installation

Boskalis performs float-over of 11,500-tonne topsides

Oil & GasSurgical precision, that’s how the float-over installation of the 11,500-tonne Bokor CPP-A platform topsides offshore Sarawak, Malaysia, can be characterised. For this incredibly precise operation, Boskalis’ semi-submersible heavy transport vessel Forte was fitted out with...Read more
|Comment|author: Adnan Bajic