Controlling the movements of the relatively light blades of a turbine when suspended from a crane, has proven to be an installation challenge due to wind load. To mitigate operational downtime and increase the integrity...Read more
Van Oord and Mammoet have teamed up with Verton, “a promising scale-up” which has developed a new lifting method for the installation of wind turbine blades. The company was scouted via the Rotterdam-based maritime innovation...Read more