Almost a year on after delivering the 6780.5-ton Dogger Bank A HVDC converter station, BigLift Shipping’s DP2 heavy transport vessel BigLift Baffin has delivered the 9,100-ton Dogger Bank B converter station to Haugesund. Specifically, the...Read more
Seaway 7 has scooped up a sizeable contract for the transport and installation of monopile foundations and transition pieces on the third phase of the Dogger Bank Offshore Wind Farm, Dogger Bank C. Seaway 7...Read more