![](https://www.projectcargojournal.com/wp-content/uploads/2023/03/GLS-128x128.jpeg)
![](https://www.projectcargojournal.com/wp-content/uploads/2023/03/GLS-128x128.jpeg)
![Demolition of Montreal’s Champlain Bridge advances](https://www.projectcargojournal.com/wp-content/uploads/2022/11/Pomerleau-128x128.jpeg)
Demolition of Montreal’s Champlain Bridge advances
Demolition of the Champlain Bridge, a steel truss cantilever bridge over the Saint Lawrence river, opened in 1962, began two years ago. The dismantling of the 1st pier at Nun’s Island began last week.Read more![](https://www.projectcargojournal.com/wp-content/uploads/2022/09/yacht2-128x128.jpg)
Fednav ships superyacht structures from Antwerp to Milwaukee
The Montreal-based maritime transportation company, Fednav Limited, shipped superstructures for a 37 metres superyacht, weighing 40 tonnes. The cargo was shipped from Belgium to the United States aboard the Federal Cedar bulk carrier ship.Read more![](https://www.projectcargojournal.com/wp-content/uploads/2022/09/PSA-Antwerp-128x128.jpeg)
PSA Breakbulk loads superyacht structures destined for Canada
PSA Breakbulk, one of the Port of Antwerp’s largest steel and general cargo handlers, loaded three separate structures for a superyacht currently under construction, for their Montreal-based client Fednav Limited.Read more![](https://www.projectcargojournal.com/wp-content/uploads/2022/08/CMA-CGM-128x128.jpeg)