Altius delivers 176-ton reactor for the delayed Mutun project
Altius Bolivia was tagged in to complete the transport of a 176-ton reactor for the Mutun Steel Plant. Contracted by Sinosteel MECC the low-carbon steel…
Altius Bolivia was tagged in to complete the transport of a 176-ton reactor for the Mutun Steel Plant. Contracted by Sinosteel MECC the low-carbon steel…
The Spanish company Altius carried out the transport of LNG tanks and accessories between two Spanish ports, the Port of Aviles and Port of Algeciras’…
Altius S.A., part of the Project Logistics Alliance, recently transported project cargo for the El Mutun project in Bolivia. The company loaded ten engines at…
PRESS RELEASE – Altius has organized the shipment of two 122-tonne heat exchangers plus accessories from the OVS Vertova manufacturing plant in Northern Italy to…