Van Oord will install 62 jacket foundations and foundation piles for the Saint-Brieuc offshore wind farm (OWF). 190 pin piles will be used at the 75 square kilometres site, 16,3 kilometres off the coast of...Read more
The last of twelve wind turbine monopiles, the steel tubes driven into the sea bed, were installed by Ballast Nedam, on the soft seawall of ‘De Tweede Maasvlakte,’ for the wind-turbine park. This park is...Read more