Uruguayan company Corporación Navios has invested in the increase of terminal’s handling rates with the installation of a type FCC 300 Liebherr harbour crane. The permanently installed unit replaces a long duty cycle crane. The...Read more
The construction of Offshore Heavy Transport’s (OHT) new heavy-lift vessel Alfa Lift has recently reached a new milestone with the installation of the Liebherr main crane. Currently under construction at China Merchants Heavy Industry (CMHI) shipyard...Read more
Port of Dover has boosted its capability of handling and distributing breakbulk, project cargo and every other range of cargo following the arrival of two new Liebherr harbour cranes.Read more
The Toledo-Lucas County Port Authority is preparing to tackle the future project cargo challenges with the delivery of a new Liebherr mobile harbour crane. The LHM 550 will give TLCPA the opportunity to handle bigger...Read more
An MK 88 Plus belonging to crane service provider Nolte Auto-Krane has completed a veritable lifting marathon as part of a structural inspection of the North Sea barrage near Husum. During its tough eight-week assignment,...Read more
The heavy-lift vessel Combi 1, owned by SAL Heavy Lift recently completed the transshipment of mobile harbour cranes to Ivory Coast. Terminal Industriel Polyvalent de San Pedro (TIPSP) ordered the two LHM 550 cranes at...Read more
Liebherr is making steps in decarbonising operations at its Ehingen facility by powering its mobile and crawler cranes exclusively with pure HVO fuel starting September 2021.Read more
Australia’s Port of Newcastle is investing $28.4 million into expanding its existing project cargo, general cargo and container handling capability. The port’s investment covers two Liebherr LHM 550 mobile harbour cranes and associated infrastructure at...Read more
German developer of construction machinery, Liebherr, has reached a milestone with 1,300th shipped from the Rostock premises to its final destination in Ghana. Read more
Rhenus Midgard is replacing a crane at the Dradenau Terminal in the Port of Hamburg with a new Liebherr machine to handle breakbulk and containers. Read more
EquipmentThe Port of Södertälje has acquired the first Liebherr mobile harbour crane running on fossil-free HVO100 diesel. The new LHM 420 mobile harbour crane was recently delivered to the port and will significantly improve handling...Read more
EquipmentCrane manufacturer Liebherr has developed a system that allows crane drivers to operate two cranes as one. It’s similar to platooning in transport, but unlike the follower trucks, the follower crane does not just simply...Read more
Inland shippingLiebherr-Mining Equipment in Colmar has booked huge CO2-savings by shifting its pre-haulage from the roads to the rivers. The company began a pilot project mid-2019 and has since shipped 148 machines divided over 60 barges....Read more
Orion accidentCrane manufacturer Liebherr and offshore contractor Deme have decided to repair the 5000-tonne crane of installation vessel “Orion”, which collapsed almost six months ago in Rostock during an overload test. Read more
EquipmentPRESS RELEASE – Liebherr has fully assembled its first crane with the aid of the company’s new Remote Service tool. Close cooperation between Liebherr-Argentina on-site in Campana and head office Liebherr MCCtec Rostock GmbH, Germany...Read more
EquipmentPRESS RELEASE – Liebherr has developed a remote service tool for crawler cranes, deep foundation equipment and maritime cranes. The app allows operators to share visual information, resulting in faster and easier troubleshooting. As part...Read more
Heavy-liftingNew video footage of the Orion crane incident has emerged on social media and it confirms that a failing hook was the cause for the accident aboard the offshore installation vessel. Read more
EquipmentRopeblock, the designer of the faulty crane hook that caused the Orion accident, says it is appalled by the incident and the impact it has on the industry. “Based on the information that is currently...Read more
EquipmentA malfunctioning hook from an external supplier caused the crane accident onboard Deme’s new offshore vessel Orion. Why the hook did not withstand the load is still unclear but authorities and experts unanimously agree that...Read more
EquipmentThe 5,000-tonne heavy-lift crane of DEME’s new installation vessel Orion has collapsed while undergoing load tests at Liebherr’s construction yard in Rostock. A few people sustained minor injuries but the vessel has been significantly damaged....Read more