The Belgium-based company, Sarens, completed the load-out of 71 gravity-based structures (GBS) from the Port of Le Havre. These will support the Fécamp OWF’s Halide 160 6MW wind turbines, which will be placed 13 to...Read more
The topside of the Fécamp Offshore Windfarm has been transported from Saint Nazaire port, on the Loire estuary, to an interim storage port in Cherbourg-En-Cotentin. The transport was organised by the Antwerp-based company, Manora Logistics.Read more
The Roll on/Roll off vessel Rotra Vente delivered a shipment of wind turbine rotor hubs in the Port of Le Havre (HAROPA). This shipment was handled by the Delfzijl-based company Amasus.Read more
The Dutch maritime support provider, Acta Marine, will be supplying the French, renewable energy focused, engineering company, Siemens Gamesa, with a walk-2-work vessel, the Acta Auriga. It will assist with the commissioning of two French...Read more